3D printer Step motor 90mm Long Lead Linear Screw Nut Slider  Stepper Motor DC 5V 2-phase 4-wire Stepping Motor ► Photo 1/5
3D printer Step motor 90mm Long Lead Linear Screw Nut Slider  Stepper Motor DC 5V 2-phase 4-wire Stepping Motor ► Photo 1/5
3D printer Step motor 90mm Long Lead Linear Screw Nut Slider  Stepper Motor DC 5V 2-phase 4-wire Stepping Motor ► Photo 2/5
3D printer Step motor 90mm Long Lead Linear Screw Nut Slider  Stepper Motor DC 5V 2-phase 4-wire Stepping Motor ► Photo 3/5

Specifications

  • Origin: CN(Origin)
  • Certification: ce
  • Certification: RoHS
  • Step Angle(degrees): 18
  • Phase: 2
  • Type: Permanent Magnet
  • Model Number: 90mm
  • Condition: New
  • Model: Mini 15mm Stepper Motor
  • Resistance per Phase: 15.5 ohms
  • Wiring Configuration: 4-Wire Bipolar
  • Country/Region of Manufacture: China
  • Full Step Angle: 18
  • Shaft Diameter: 3mm
  • Nominal Rated Input Voltage: DC 5V

3D printer Step motor 90mm Long Lead Linear Screw Nut Slider Stepper Motor DC 5V 2-phase 4-wire Stepping Motor

Seller:
Alitools rating:
89%
/
Aliexpress rating:
100%
18.58 – 24.57 $
66   orders
/
2   reviews
Rating: 5

Price history

Price drop notification

Out telegram bot will notify you once the price drops to the desirable one

This item is from other sellers