90mm Long Lead Linear Screw Nut Slider  Stepper Motor DC 5V 2-phase 4-wire Stepping Motor DIY 3D printer ► Photo 1/5
90mm Long Lead Linear Screw Nut Slider  Stepper Motor DC 5V 2-phase 4-wire Stepping Motor DIY 3D printer ► Photo 1/5
90mm Long Lead Linear Screw Nut Slider  Stepper Motor DC 5V 2-phase 4-wire Stepping Motor DIY 3D printer ► Photo 2/5
90mm Long Lead Linear Screw Nut Slider  Stepper Motor DC 5V 2-phase 4-wire Stepping Motor DIY 3D printer ► Photo 3/5

Specifications

  • Origin: CN(Origin)
  • Certification: NONE
  • Phase: 2
  • Type: Permanent Magnet
  • Condition: New
  • Model: Mini 15mm Stepper Motor
  • Resistance per Phase: 15.5 ohms
  • Wiring Configuration: 4-Wire Bipolar
  • Country/Region of Manufacture: China
  • Current Type: DC
  • Full Step Angle: 18
  • Shaft Diameter: 3mm
  • Nominal Rated Input Voltage: 5V

90mm Long Lead Linear Screw Nut Slider Stepper Motor DC 5V 2-phase 4-wire Stepping Motor DIY 3D printer

Seller:
Alitools rating:
87%
/
Aliexpress rating:
0%
17.35 – 24.40 $
13   orders
Rating: 0

Price history

Price drop notification

Out telegram bot will notify you once the price drops to the desirable one

This item is from other sellers