Wholesale and retail long leads yellow Axial Polyester Film Capacitors electronics 0.047uF 630V fr tube amp audio free shipping ► Photo 1/4
Wholesale and retail long leads yellow Axial Polyester Film Capacitors electronics 0.047uF 630V fr tube amp audio free shipping ► Photo 1/4
Wholesale and retail long leads yellow Axial Polyester Film Capacitors electronics 0.047uF 630V fr tube amp audio free shipping ► Photo 2/4
Wholesale and retail long leads yellow Axial Polyester Film Capacitors electronics 0.047uF 630V fr tube amp audio free shipping ► Photo 3/4

Photos of buyers

6 more
photos

Specifications

  • Brand Name: Cayyi
  • Extension Cable Length: None
  • Surge Protector: No
  • Grounding: Non-Grounding
  • Overload Protection: No
  • Outlets Number: 1
  • Type: tube sockets
  • WIFI: No
  • Rated Current: NONE
  • Synchronous Rectification Technology: No
  • USB Total Power: NONE
  • Support Quick Charge: No
  • Application: Residential / General-Purpose
  • Rated Power: NONE
  • Sub-control Switch: No
  • Master Switch: No
  • Model Number: 10x473/630
  • USB Ports Number: None
  • Rated Voltage: 110-250V
  • Single USB Max Output: None

Wholesale and retail long leads yellow Axial Polyester Film Capacitors electronics 0.047uF 630V fr tube amp audio free shipping

Seller:
Alitools rating:
34%
/
Aliexpress rating:
90%
7.26 – 8.71 $
34   orders
/
12   reviews
Rating: 4.5

Price history

Price drop notification

Out telegram bot will notify you once the price drops to the desirable one

Customer Reviews

Y***o
October 13, 2020

Goods do not come. Do not read the message. A terrible store.

Y***o
September 25, 2020

Commodity does not reach. Refund after objection.

Anonymous