PU Leather Walking Rope Dog Leash for Small Medium Large Dogs Harness Leash Running Safe Dog Belt Pet Dog Collar Long Lead Leash ► Photo 1/6
PU Leather Walking Rope Dog Leash for Small Medium Large Dogs Harness Leash Running Safe Dog Belt Pet Dog Collar Long Lead Leash ► Photo 1/6
PU Leather Walking Rope Dog Leash for Small Medium Large Dogs Harness Leash Running Safe Dog Belt Pet Dog Collar Long Lead Leash ► Photo 2/6
PU Leather Walking Rope Dog Leash for Small Medium Large Dogs Harness Leash Running Safe Dog Belt Pet Dog Collar Long Lead Leash ► Photo 3/6

Photos of buyers

46 more
photos

Specifications

  • Brand Name: Senristar
  • Type: Leashes
  • Dog Leash Type: Basic Leashes
  • Origin: CN(Origin)
  • Material: Leather
  • Type: Dogs
  • Season: All seasons
  • Pattern: Solid
  • Feature: Breakaway
  • Feature: Quick Release
  • Color: Pink,Red,Black,Blue,Brown,Yellow,Purple,Green
  • Size: S,M
  • Length: 120cm/47.24''
  • Width: 1.5cm/0.59'',2.0cm/0.79''
  • Material: PU Imitation Leather
  • Feature: Training,Strong,Walking
  • Applicable Breeds: Small, Medium, Large Dog/Cat
  • Weight: 80g,110g

PU Leather Walking Rope Dog Leash for Small Medium Large Dogs Harness Leash Running Safe Dog Belt Pet Dog Collar Long Lead Leash

Seller:
Alitools rating:
40%
/
Aliexpress rating:
96%
4.07 4.74 $
69   orders
/
31   reviews
Rating: 4.8

Price history

Price drop notification

Out telegram bot will notify you once the price drops to the desirable one

Customer Reviews

B***r
January 19, 2021

I bought this leash for my 30 kg dog (retriever) and it is sturdy enough to hold a dog of this size and strength**Leash as described and pictured**Item arrived within the designated time frame**Happy about this purchase - many thanks!!!

B***r
January 19, 2021

I chose this leash as the color was suitable for my dogs harness**The quality is good and the leash came as described and pictured**Item arrived within the designated time frame**Many thanks for this smooth transaction!

Anonymous