Durable Dog Tracking Leash Nylon Long Leads Rope Pet Training Walking Leashes 3m 5m 10m 20m For Medium Large Dogs Non-slip ► Photo 1/6
Durable Dog Tracking Leash Nylon Long Leads Rope Pet Training Walking Leashes 3m 5m 10m 20m For Medium Large Dogs Non-slip ► Photo 1/6
Durable Dog Tracking Leash Nylon Long Leads Rope Pet Training Walking Leashes 3m 5m 10m 20m For Medium Large Dogs Non-slip ► Photo 2/6
Durable Dog Tracking Leash Nylon Long Leads Rope Pet Training Walking Leashes 3m 5m 10m 20m For Medium Large Dogs Non-slip ► Photo 3/6

Photos of buyers

78 more
photos

Specifications

  • Brand Name: PET ARTIST
  • Type: Leashes
  • Dog Leash Type: Basic Leashes
  • Pattern: Solid
  • Material: Nylon
  • Season: All seasons
  • Type: Dogs
  • Feature: tracking training leash
  • is_customized: Yes
  • Length: 3m,5m,10m,20m
  • Applicable Dog Breed: medium large
  • Color: Beige/Coffee
  • Leash Type: Tracking Training Leash
  • Function: Walking Training Tracking

Durable Dog Tracking Leash Nylon Long Leads Rope Pet Training Walking Leashes 3m 5m 10m 20m For Medium Large Dogs Non-slip

Seller:
Alitools rating:
90%
/
Aliexpress rating:
86%
11.54 – 31.16 $
25   orders
/
3   reviews
Rating: 4.3

Price history

Price drop notification

Out telegram bot will notify you once the price drops to the desirable one

Customer Reviews

S***r
January 24, 2021

i gold thd selker i want go cancell my order. hr confirmed and neverthe less charged me

J***r
December 30, 2020

I expected a bit tougher quality. But never the less. Good product and a happy dog!

Anonymous